Inside the workshop: how an Aktí gets built in 60 days

From the first cut of cedar to the moment a finished volume rolls out the workshop door — a walk through the Aktí build floor in Limassol.

Post hero image

Every Aktí starts as a stack of timber and a decision. Our workshop in Limassol industrial zone takes 60 days to take a model from frame to finish — pre-fabricated, pre-tested, pre-fitted. By the time it arrives on your site, the work that's left fits in three days.

This piece walks through that 60 days: the carpentry, the joinery, the render coats, the testing of every threshold and seal before delivery.